The Drain Points
The problems operators learn to live with.
Four high-volume Tennessee locations doing a lot of things right. But their chemical program had become bloated, inconsistent, and reactive. These challenges were driving up costs, reducing efficiency, and creating unnecessary strain on their team and equipment.
- Persistent reclaim odors degrading customer experience
- Dirty tunnels requiring constant daily attention
- Corrosion building up on equipment surfaces
- 16-SKU chemical program crowding the backroom
- Annual water costs exceeding $550K
- Excessive labor time spent on daily cleaning
These are the kind of problems many operators learn to live with, until they don’t have to.
Annual water savings
Annual labor savings
Fewer SKUs to manage
Total annual savings after switching to Ver-Tech Labs
Before — Bulky drums, crowded backrooms
After — Ver-tech VAULT system installed
The Ver-tech Way
Four changes. Measurable impact on every one.
The Results
What $300K in annual savings actually looks like.
By the close of 2024, the results were clear across the board—lower water costs, reduced labor, eliminated reclaim odor, and equipment lasting longer.
$250K
Annual water savings across all 4 locations
$65K
Annual labor savings from reduced maintenance
75%
Reduction in pit cleaning frequency
50%
Fewer SKUs — from 16 products down to 8
30 day
Filter replacement cycle, previously required daily
Zero
Equipment corrosion or chemical buildup reported
Are you ready to schedule a site evaluation?
*Results of this case study are specific to Camel Express and may not reflect typical outcomes. Individual results depend on a variety of factors including site conditions, equipment, facility layout, water quality, environmental considerations, operational practices, and more. Ver-tech Labs cannot guarantee specific results for any operation.